The AHA EM 385 form serves as a crucial tool for conducting Activity Hazard Analysis (AHA), with the primary goal of identifying work tasks, assessing potential hazards, and establishing necessary controls to mitigate risks. This document, rooted in the guidelines of EM 385 2008, cultivates a safer work environment by prompting contractors to analyze severity, probability, and overall risk assessment codes (RAC) for various job tasks. Ready to ensure a safer workplace? Click the button below to start filling out your AHA EM 385 form today.

Access Aha Em 385 Editor Now
Table of Contents

In every construction project, ensuring the safety of all involved is paramount, and this is where the Activity Hazard Analysis (AHA) EM 385 form plays a crucial role. Designed as a comprehensive tool, it guides users through a detailed evaluation of potential hazards associated with specific activities and tasks on a project site. The form requires identifying the overall risk assessment code (RAC), which considers the severity of potential incidents and their likelihood, from frequent to unlikely occurrences. The purpose of this analysis is to establish control measures that significantly reduce these risks to an acceptable level. Beyond being a one-time checklist, the AHA EM 385 form is a dynamic document, expected to evolve in response to changes in site conditions, operations, or personnel qualifications. Notably, it emphasizes pre-planning to prevent unplanned incidents and mandates detailed reviews by qualified individuals before any work commences. This ensures that any activity, regardless of its scale, is executed with a clear understanding of the associated risks and the measures in place to mitigate them, aligning with the stringent requirements set out by the U.S. Army Corps of Engineers (COE) and Occupational Safety and Health Administration (OSHA) guidelines.

Form Preview

Form Breakdown

Fact Name Description
Purpose of AHA The Activity Hazard Analysis (AHA) is a tool used to analyze work tasks, identify hazards, and determine necessary controls to reduce or eliminate risks.
Risk Assessment Code (RAC) Considers the severity of potential incidents and the probability of their occurrence, classifying the risk as High (H), Moderate (M), or Low (L).
Component of EM 385-1-1 Safety Program The AHA is required under EM 385-1-1 regulations and is integral to the safety management system for activities involving U.S. Army Corps of Engineers (USACE) projects.
Living Document As a dynamic document, the AHA must be regularly reviewed and updated to reflect changes in site conditions, operations, or personnel.
Pre-Work Approval Work may not begin until the AHA has been accepted by the Government Designated Authority (GDA) and discussed with all parties involved in the work activity.
Qualified Personnel Identification Names of competent or qualified individuals required for specific tasks, as defined by OSHA and EM 385-1-1, must be identified in the AHA.

Guidelines on Filling in Aha Em 385

Completing the Activity Hazard Analysis (AHA) form EM 385 is crucial for identifying and mitigating risks in project tasks. This form serves to outline potential hazards, assess the overall risk, and establish appropriate controls to ensure safety. It also helps in pre-planning activities to prevent unplanned events on job sites. The dynamic nature of work environments means the AHA is a living document that must be revised as site conditions, operations, or personnel change. To correctly fill out this form, follow these steps to ensure that all aspects of the risk assessment are covered thoroughly.

  1. Start by identifying the activity or work task at the top of the form. This includes giving a brief description of the task to be performed.
  2. Assess the overall Risk Assessment Code (RAC) for the task. Utilize the RAC matrix to determine the highest code by considering the severity of potential incidents and the probability of their occurrence.
  3. Enter the project location and contract number, along with the date the form is prepared.
  4. Provide the names and titles of individuals who prepared and reviewed the AHA form.
  5. Under the "Job Steps" section, break down the task into detailed steps or phases.
  6. Identify potential hazards associated with each job step.
  7. Outline specific controls that will be implemented to mitigate identified hazards. This could include safety procedures, equipment, or training requirements.
  8. Determine and note the RAC for each hazard by evaluating its probability and severity. Ensure that the overall highest RAC is annotated at the top of the AHA.
  9. List all equipment that will be used and specify any inspection requirements to ensure they are safe and appropriate for the task.
  10. Identify training requirements and names of competent or qualified personnel involved in the task. This includes specifying any necessary certifications or specialized knowledge.
  11. Conclude the form by reviewing notes, such as new insights, review comments, or additional precautions that were identified during the risk assessment process.

After completing the AHA form, it's important to review it with all team members involved in the task, including subcontractors and government on-site representatives, if applicable. This ensures everyone is aware of the potential hazards and controls before work commences. Regular updates to the AHA are essential to reflect any changes in site conditions, operations, or personnel, maintaining safety and compliance throughout the project’s lifecycle.

Learn More on Aha Em 385

What is an AHA EM 385 form?

The AHA EM 385 form, or Activity Hazard Analysis, is a crucial document used in construction and other industries to ensure safety and compliance with the U.S. Army Corps of Engineers' Safety and Health Requirements Manual, EM 385-1-1. It serves as a risk assessment tool that outlines the work or activity to be performed, identifies potential hazards, and establishes controls to reduce these hazards to an acceptable risk level. This form is a living document, meaning it should be continuously updated to reflect changes in site conditions, operations, or personnel.

Why is the AHA EM 385 form important?

The AHA EM 385 form is important because it helps prevent accidents and unplanned events on job sites by pre-planning activities. It requires the identification and mitigation of potential hazards before work begins, thus ensuring a safer work environment. Additionally, it is a requirement by the U.S. Army Corps of Engineers for projects to ensure compliance with their safety guidelines, with the ultimate goal of reducing the likelihood and severity of workplace incidents.

How is the Overall Risk Assessment Code (RAC) determined on the AHA EM 385 form?

The Overall Risk Assessment Code (RAC) on the AHA EM 385 form is determined by reviewing each identified hazard along with its associated safety controls. Two main factors are considered:

  1. Probability: The likelihood of an incident, near miss, or accident occurring, categorized as Frequent, Likely, Occasional, Seldom, or Unlikely.
  2. Severity: The potential outcome or degree of impact if an incident, near miss, or accident did occur, categorized as Catastrophic, Critical, Marginal, or Negligible.
These factors are combined to identify the RAC as either E, H, M, or L (High, Moderate, or Low Risk) for each hazard. The overall highest RAC is then annotated at the top of the AHA.

What steps must be taken before work begins according to the AHA EM 385?

Before work can begin on a project, certain preparatory steps outlined by the AHA EM 385 must be completed:

  • The AHA for the work activity must be accepted by the Government Designated Authority (GDA).
  • All parties engaged in the activity, including contractors, subcontractors, and the Government on-site representative, must discuss the AHA during preparatory and initial control phase meetings.
  • Identification of Competent/Qualified personnel as specified by OSHA and EM 385-1-1 for certain activities (e.g., Excavation, Fall Protection).
These steps ensure that all potential hazards are identified and mitigation strategies are in place before the initiation of work, promoting a safer work environment.

Can the AHA EM 385 form be modified?

Yes, the AHA EM 385 form is a living document and can—and should—be modified as necessary. This flexibility allows it to address changing site conditions, operations, or personnel changes. Modifications ensure that the form accurately reflects the current state of the work environment and continues to effectively mitigate risks associated with the work activities.

Who needs to review and accept the AHA EM 385 form?

The AHA EM 385 form must be reviewed and accepted by the Government Designated Authority (GDA) before work can start. Additionally, it should be discussed with all stakeholders engaged in the activity, including the contractor, any subcontractors, and the Government on-site representative. This comprehensive review process ensures that everyone is aware of the potential hazards and the control measures in place to mitigate them, fostering a collective responsibility for safety on the job site.

Common mistakes

  1. Failing to properly identify and assess all potential hazards associated with the task at hand is a common mistake. This step is crucial for establishing an accurate overall Risk Assessment Code (RAC).

  2. Not utilizing the Risk Assessment Code (RAC) Matrix correctly to determine the severity and probability of each hazard can lead to an incorrect assessment of the overall risk.

  3. Some individuals overlook the importance of annotating the highest RAC at the top of the Activity Hazard Analysis (AHA) document, which is essential for immediate identification of the overall risk level.

  4. There is often a lack of detailed review of safety controls associated with each identified hazard. It’s vital to determine if these controls adequately mitigate the risks.

  5. Omitting the names of competent or qualified personnel required for the activity is another oversight. These are specified by OSHA and EM 385-1-1 and are critical for ensuring the task is performed safely.

  6. Failure to list and verify all required equipment and ensure it has passed inspection requirements can lead to unsafe working conditions.

  7. Not reviewing and modifying the AHA to reflect changing site conditions, operations, or changes in competent/qualified personnel can result in outdated and ineffective hazard controls.

  8. Some individuals do not discuss the finalized AHA with all parties engaged in the activity, including contractors, subcontractors, and Government on-site representatives. This is a required step before work begins.

  9. Lastly, not treating the AHA as a living document that changes with site conditions or operations is a mistake. Continuous updates are necessary to maintain its relevance and effectiveness.

Remember, avoiding these mistakes can significantly improve workplace safety and compliance with the EM 385-1-1 safety and health requirements. Proper completion and use of the AHA is a fundamental step towards preventing unplanned events on job sites.

Documents used along the form

The Activity Hazard Analysis (AHA) EM 385 form is a crucial document designed to improve workplace safety in construction settings. It serves not only as a risk assessment tool but also outlines work tasks, identifies hazards, and establishes control measures to mitigate risks. Given its importance in maintaining safety standards, this form is often used alongside several other documents that support and amplify its effectiveness. These additional forms and documents ensure a comprehensive approach to workplace safety.

  • Job Safety Analysis (JSA) Form: Similar to the AHA, a JSA focuses on identifying potential hazards associated with specific job tasks. It breaks down a job into its component steps, analyzes each step for hazards, and determines preventive measures to eliminate or reduce these hazards.
  • Daily Safety Inspection Checklist: This checklist is used to perform daily safety inspections of the work site. It covers a wide range of areas, including equipment, materials, work area conditions, and personal protective equipment (PPE), ensuring that all aspects of the site meet safety standards daily.
  • Incident Report Form: In the event of an accident or near miss, an incident report form is filled out. This document records the details of the incident, including what happened, where and when it occurred, who was involved, and any immediate actions taken. It is vital for investigating incidents and developing measures to prevent future occurrences.
  • Safety Meeting Minutes Template: Safety meetings are an essential part of a proactive safety culture. This template helps to document the discussions, topics covered, decisions made, and action items identified during safety meetings. It ensures that there is a record of commitments to improving workplace safety.

Using these documents in conjunction with the AHA EM 385 form creates a robust framework for managing safety on construction sites. They allow for a proactive approach to identifying and controlling hazards, ensuring that all team members are aware of potential risks and the measures in place to protect them. This comprehensive approach not only helps to prevent accidents and incidents but also fosters a culture of safety and compliance within the organization.

Similar forms

  • The Job Safety Analysis (JSA) document shares significant similarities with the AHA EM 385 form. Like the AHA, the JSA focuses on breaking down a job into individual tasks, identifying potential hazards associated with each task, and outlining measures to mitigate these hazards. Both documents aim to proactively manage risks by thorough planning and analysis of the job at hand. The main difference usually lies in the specific format and some of the terminology used, with the AHA often being more detailed in the context of compliance with EM 385-1-1 standards.

  • The Site-Specific Safety Plan (SSSP) is another document that parallels the AHA EM 385 form in many respects. SSSPs are comprehensive plans developed for specific projects or job sites, detailing all safety and health guidelines, hazard analyses, and control measures for the entire site. The AHA can be considered a component or subset of the SSSP, focusing specifically on analyzing hazards and defining controls for particular tasks or activities within the larger project framework. Both documents are critical in ensuring that work proceeds safely and in compliance with regulatory requirements.

  • The Risk Assessment Form shares the same core principle of hazard identification and risk mitigation as the AHA EM 385 form. Both documents require the evaluation of the likelihood and severity of hazards to determine the level of risk (RAC in the AHA). They serve to guide the necessary precautions and procedures to lower the risks associated with job tasks. However, risk assessments can be broader in scope, considering not only physical safety risks but also environmental, financial, and reputational risks depending on the context.

  • Construction Safety Plan (CSP) documents bear a resemblance to the AHA EM 385 form by encompassing safety and health policies, procedures, and operational practices specific to construction projects. While a CSP provides an overarching safety framework for a construction project, including compliance with regulations, emergency response plans, and safety roles, the AHA delves deeper into the analysis of hazards linked to individual work tasks. The AHA's specificity in identifying hazards, assessing risks, and outlining control measures makes it an integral part of the broader CSP.

Dos and Don'ts

Completing the Activity Hazard Analysis (AHA) form as per EM 385 regulations is essential for ensuring safety and compliance on project sites. Here are some key dos and don'ts to consider when filling out this crucial document:

Do:
  1. Review the hazards and controls carefully: Take the time to thoroughly assess each hazard associated with your project tasks, along with the identified safety controls. This critical step helps ensure that risks are accurately evaluated and mitigated.

  2. Use the highest Risk Assessment Code (RAC): After evaluating the probabilities and severities of incidents, annotate the form with the overall highest RAC. This action highlights the most significant risks, focusing attention where it's needed most.

  3. Include comprehensive project and personnel details: Document the project location, contract number, and the names of key personnel, including those qualified or competent in required areas (e.g., scaffolding, excavation). Accurate records help align responsibilities and enhance communication.

  4. Update as necessary: Remember that the AHA is a living document. Review and modify it to reflect site condition changes, operations adjustments, or personnel changes. This ensures the analysis remains relevant and effective throughout the project life.

Don't:
  1. Overlook the severity and probability of hazards: Failing to adequately assess the likelihood or potential impacts of hazards can lead to underestimating risks, compromising safety measures and preparedness.

  2. Ignore the need for high RAC attention: Neglecting to identify and prioritize high-risk assessments may result in inadequate control measures being implemented, increasing the potential for accidents or near misses.

  3. Leave out details about equipment and training requirements: Skipping over the documentation of necessary equipment, training demands, and the names of competent or qualified personnel can lead to gaps in safety protocols and misunderstandings.

  4. Assume the initial AHA submission is final: Treating the AHA as a one-time task rather than an evolving document can lead to outdated hazard analysis, potentially overlooking new risks or changes in project scope and conditions.

Misconceptions

  • One common misconception is that the AHA EM 385 form is optional for projects. This couldn't be further from the truth. Every project requires an Activity Hazard Analysis (AHA) before beginning work. This ensures that potential hazards are identified and controlled.

  • Some people believe that once completed, the AHA EM 385 form is set in stone. However, it's actually a living document. It must be reviewed and updated as necessary to reflect changing site conditions, operations, or any change in competent/qualified personnel.

  • There's a misconception that the AHA form is overly complex and difficult to understand. Although comprehensive, its primary goal is to ensure safety by identifying hazards and establishing controls to reduce them to an acceptable risk level. With the right guidance, completing it becomes straightforward.

  • Many think that the AHA EM 385 form is only about identifying hazards. While hazard identification is crucial, the form also serves to assign Risk Assessment Codes (RAC) to each hazard and detail safety controls and training requirements.

  • A misunderstanding exists that the AHA is only the responsibility of project managers. While they play a significant role, the AHA requires input from a range of personnel, including those with specific competencies or qualifications related to particular tasks or equipment.

  • Some are under the impression that the AHA EM 385 is a one-person job. In reality, it requires review and approval by the Government Designated Authority (GDA) and must be discussed with everyone engaged in the activity, including contractors, subcontractors, and government on-site representatives.

  • Lastly, a common error is thinking that the AHA applies only to high-risk activities. However, it encompasses all work tasks and activities, no matter their perceived risk level, to ensure a comprehensive approach to workplace safety.

Key takeaways

The AHA EM 385 form is a crucial document for ensuring safety and preparedness in construction and other hazardous work environments. Here are key takeaways about filling out and using this form effectively:

  • The form serves as a foundation for identifying and analyzing potential hazards for activities or tasks, defining the work to be performed.
  • It incorporates a Risk Assessment Code (RAC) which combines the severity of potential incidents with their probability of occurring, guiding the prioritization of hazard controls.
  • It's imperative to review each identified hazard and assign a corresponding RAC, considering both the likelihood of the event happening and the potential severity of outcomes.
  • A thorough analysis requires identifying controls for each hazard to reduce the associated risks to an acceptable level.
  • The AHA is not static; it's a living document that must be reviewed and updated as site conditions, operations, or personnel change.
  • Before work begins, the AHA must be accepted by the Government Designated Authority (GDA) and discussed with everyone involved, including contractors, subcontractors, and government on-site representatives.
  • Specific roles such as Competent/Qualified persons, as defined by OSHA and EM 385-1-1 standards, must be identified in the AHA for particular activities.
  • The highest overall RAC determined during the assessment should be prominently noted at the top of the AHA form.
  • Details about the necessary equipment, training requirements, and inspection obligations are also included in the AHA to ensure thorough preparedness and risk management.
  • This form is an essential component of pre-planning activities to help avoid unplanned events and ensure the safety of all workers on job sites.

Understanding and correctly using the AHA EM 385 form is pivotal in creating a safe working environment, helping to manage and mitigate potential hazards in a structured and effective manner.